Projects
The Company currently has four hydroelectric plants in commercial operations:
- Generadora Pedregalito, S.A. – Pedregalito 1 located in Boquerón, Chiriquí, with an installed capacity of 20MW
- Generadora Río Chico, S.A. – Pedregalito 2 located in Alanje, Chiriquí, with an installed capacity of 12.5MW
- Generadora Alto Valle, S.A. – Cochea located in Dolega, Chiriquí, with an installed capacity of 15.7MW
- Hydro Caisán, S.A. – El Alto located in Renacimiento, Chiriquí, with an installed capacity of 72MW