Hydroelectric Plant El Alto
Company Name: Hydro Caisán, S.A.
Technical Data
Installed Capacity: | 72MW |
Generation: | 270 GWh/year based on average historical hydrology |
Equipment: | Three groups of Andritz turbogenerators 22.3MW capacity each |
Design flow: | 60m³/s |
Interconnection: | 6 km 230 kV line connected to Dominical substation |
El Alto, which finalized construction in August 2014, is located in the Chiriquí Viejo river, Caizán Village, Renacimiento District, Chiriquí Province.