Hydroelectric Plant Pedregalito 1

Company Name:  Generadora Pedregalito, S.A.

Technical Data

Installed Capacity: 20MW
Generation: 85 GWh/year based on average historical hydrology
Equipment: Two groups of Andritz turbogenerators 10MW capacity each
Design flow: 40m³/s
Interconnection:: 7 km 34.5 kV line connected to ETESA’s Boquerón 3 substation

Pedregalito 1, which finalized construction in April 2011, is located in Boquerón District, Province of Chiriquí, approximately 20 kilometers west of the city of David.