Hydroelectric Plant Pedregalito 2
Company Name: Generadora Río Chico, S.A.
Technical Data
Potencia Instalada: | 12.5MW |
Generation: | 50 GWh/year based on average historical hydrology |
Equipment: | Two groups of Andritz turbogenerators 6.5MW capacity each |
Design flow: | 40m³/s |
Interconnection: | 11 km 34.5 kV line connected to ETESA’s Boquerón 3 substation |
Pedregalito 2, which finalized construction in October 2011, is located in Alanje District, Province of Chiriquí, 2.2 kilometers downstream from Pedregalito 1’s water discharge.